Before construction begins: the decisions that make the hotel

The most successful hotel projects do not owe their success to chance. Long before construction begins, decisions made during the design phase shape operational efficiency, cost control and the satisfaction of future guests.

When we think about what makes a hotel project successful, attention naturally turns to construction, architecture or interior design. Yet much of what determines its success happens far earlier.

Before construction even begins, hundreds of key decisions will shape how well the hotel operates, its overall cost, its ability to evolve over time and, ultimately, the experience offered to future guests.

A well-executed construction phase can never make up for insufficiently considered design.

Construction cannot fix everything

Construction turns a project into reality. It does not design it.

It gives physical form to the decisions made during the design phase. It may confirm that those decisions were right and sometimes allow for adjustments, but it cannot fundamentally rethink an established spatial organisation without consequences.

When a service pantry is too small, a service lift opens in the wrong place, clean and soiled linen storage has been underestimated, delivery routes cross guest circulation, or maintenance access is overly complex, the problem is not primarily a construction issue.

It is already built into the design.

When a problem becomes apparent at handover, it is therefore almost always the consequence of a decision made several months earlier.

By that stage, the options for correction are limited, costly and often incompatible with the project schedule.

This is why the design phase is when every decision has the greatest potential impact.

Everything the guest will never see

Guests will probably never see the plant rooms, service pantries, storage areas, laundry facilities or certain back-of-house circulation routes.

And yet, part of their experience is shaped precisely there.

They will not know that a service pantry has been properly sized. But they will notice whether their breakfast arrives on time.

They will not know the route taken by the linen. But they will expect their room to be ready.

They will have no idea how goods, waste, staff and guests move through the building. But they will immediately experience the consequences if those flows intersect where they should not.

Storage areas

Storage is often one of the first things to be sacrificed when space becomes constrained.

Yet insufficient storage leads to more frequent replenishment, less efficient operations and higher operating costs throughout the life of the building.

Saving a few square metres on a storage area may look like an optimisation on a plan. It takes on a very different meaning when, every day, equipment has to be moved around because there is nowhere to put it, replenishments have to be made more frequently, or items have to be stored temporarily in places never intended for that purpose.

Likewise, a few extra metres between a service pantry and the guestrooms may seem insignificant on a drawing. Repeated dozens of times a day by a housekeeping team, they become time, fatigue and cost.

Logistics flows

In a well-performing hotel, staff, linen, waste, goods and guests move through the building without disrupting one another.

When these routes are not considered from the programming stage onwards, conflicts of use quickly emerge: unnecessary crossings, additional handling, loss of productivity and, in some cases, a deterioration in the guest experience.

The quality of a hotel does not depend solely on what the guest can see. It also relies on everything they will never see.

Making decisions while there is still time

The design phase is when there is the greatest room for manoeuvre.

It is also the point at which some decisions may appear secondary because their consequences are not yet visible.

One of the roles of the client and its project management adviser is therefore to bring into the discussion, at a very early stage, something that will only come much later: the day-to-day operation of the building.

Who will use this space?

How many times a day?

With what equipment?

Along which route?

What happens when the hotel is fully occupied?

How will this organisation need to evolve in five or ten years?

A plan becomes far more meaningful when we begin to imagine the people who will actually use the building moving through it.

Conclusion

Designing a hotel is therefore not simply about designing what the guest will see.

It is also about anticipating everything that will need to work, every day, without the guest ever having to notice it.

The most important decisions are not always the most spectacular. Sometimes they concern a few square metres of storage, the position of a door, the route taken by a trolley or the relationship between two spaces.

Taken individually, these choices may seem modest.

Together, they make the hotel.

And that is precisely why, before construction begins, time spent making the right decisions is never time wasted.

Contents

Key Takeaways

The most critical decisions are made before construction begins.

Behind-the-scenes spaces – storage areas, plant rooms and circulation flows – have a lasting impact on a hotel’s operational performance.

Insufficiently considered design leads to additional costs and operational constraints that are difficult to correct later.

The project management adviser helps secure key decisions from the earliest stages of the project.